News

Modification of Boiler control.

Aqualify is modifying a SCADA boiler control system.

Together with the costumer the existing aux boiler controls are going to be modified to a control system that is compleet remote acceseble by the operators in the control room. ,based on joint knowlage en experience.

Posted on nov, 2024

Powerplant still running after 1,5 sec black-out.

Aqualify

Project done at a major powerplant to test the factory on the 1,5 sec power-lost test.

finnaly the plat stay running after a black out off 1,5 sec.

Posted on Sunday, February 25, 2024

© Copyright 2016-2024 Aqualify